Steve Lindley Contracting

Steve Lindley Contracting

Innovative Solutions For Extraordinary Projects

  • Home
  • Past Projects
  • Current Projects
  • About Us
  • Contact Us

Lostine River – Sheep Ridge Project

October 24, 2016 By genunlimited

SLC was selected by the Grande Ronde Model Watershed to complete their Lostine River – Sheep Ridge Fish Passage Improvements Project. This project was completed during the month of September 2016.

The project was unique in that we built around an existing concrete weir structure that was impeding fish migration. In order to build around the structures and create a natural looking channel approximately 2,000 cubic yards of rock was imported. In addition to the rock placement, an existing wood diversion structure and culvert were removed. Now that the project is complete, it is estimated that 20 miles of fish passage has now been restored to the Lostine River.

Filed Under: Current Projects

Previous Post
Cavender Wetland Enhancement for the Monument Soil and Water Conservation District
Next Post
City of La Grande – Beaver Creek Dam Fish Passage

Find What You Need?

  • Home
  • Past Projects
  • Current Projects
  • About Us
  • Contact Us

Our Recent Projects

Wallowa Baker Restoration Fish Passage Project

Grande Ronde Model Watershed – Wallowa Baker Restoration Fish Passage Project

City of Pilot Rock – Stair Case Improvements

Beaver Creek Dam Fish Passage

City of La Grande – Beaver Creek Dam Fish Passage

sheep ridge construction project

Lostine River – Sheep Ridge Project

Contact Steve Lindley

PO Box 862
Union OR 97883
541-377-3476

Copyright © 2025 · Flex Pro Theme On Genesis Framework · WordPress · Log in