Grande Ronde Model Watershed Lostine Diversion Fish Passage Improvements – 2012

August 15, 2016 By Steve Lindley

Fish Passage ImprovementsThe Lostine Diversion Fish Passage Improvements included the demolition of the existing concrete structure, re-grading of approximately 300 feet of the Lostine River downstream from the previous structure, installation of 11 cross-vanes, and the construction of two wood debris structures.

SLC hauled and installed 1,470 cubic yards of boulders and 1,370 cubic yards of river gravel and backfill material in order to complete the project.

Filed Under: Past Projects, Stream Restoration

Previous Post
Grande Ronde Model Watershed Catherine Creek Baum Habitat Improvements – 2012
Next Post
Union Soil and Water Conservation District CC44 Phase II – 2014

Find What You Need?

  • Home
  • Past Projects
  • Current Projects
  • About Us
  • Contact Us

Our Recent Projects

Wallowa Baker Restoration Fish Passage Project

Grande Ronde Model Watershed – Wallowa Baker Restoration Fish Passage Project

City of Pilot Rock – Stair Case Improvements

Beaver Creek Dam Fish Passage

City of La Grande – Beaver Creek Dam Fish Passage

sheep ridge construction project

Lostine River – Sheep Ridge Project

Contact Steve Lindley

PO Box 862
Union OR 97883
541-377-3476

Copyright © 2025 · Flex Pro Theme On Genesis Framework · WordPress · Log in