SLC was selected by the City of Pilot Rock to construct their Staircase Improvements Project. Construction began in April of 2017 and completed it in May 2017.
The main goal of the project is to relocate the staircase from the City of Pilot Rock’s High School to the downtown area. The project included site preparation, earthwork, fabrication of foundations and landings, and construction of sidewalk. Pedestrians can now safely walk from the high school to the down town are safely.

The Little Creek Project involved the construction of a new diversion structure and re-graded the existing stream channel.
Three diversions were part of this project and employed similar methodology in construction. In all SLC imported 8,000 CY of select fill and/or stream simulation rock, and nearly 4,000 CY of large boulders for rock weirs and fish rock clusters.
Work for the project consisted of excavating approximately 1,800 feet of new river channel, filling in approximately 1,300 feet of existing river channel, and creating 400 feet of side channel.
The project consisted of the demolition of the existing irrigation diversion structure and construction of a new structure, creation of new irrigation diversion channel, grading and placement of stream simulation material, and instillation of numerous habitat structures, brush mats and willow bundles. In addition, new side channels and alcove areas were created.
The Lostine Diversion Fish Passage Improvements included the demolition of the existing concrete structure, re-grading of approximately 300 feet of the Lostine River downstream from the previous structure, installation of 11 cross-vanes, and the construction of two wood debris structures.
The Baum Habitat Improvements consisted of the construction of a new side channel, two large log jam structures were, along with 10 smaller woody debris jams.
SLC was awarded the contract by the City of Cove to construct a new irrigation storage pond complex totaling approximately 30 acres for the disposal of treated wastewater to increase the capacity of the existing wastewater plant.