Lostine River – Sheep Ridge Project

October 24, 2016 By genunlimited

SLC was selected by the Grande Ronde Model Watershed to complete their Lostine River – Sheep Ridge Fish Passage Improvements Project. This project was completed during the month of September 2016.

The project was unique in that we built around an existing concrete weir structure that was impeding fish migration. In order to build around the structures and create a natural looking channel approximately 2,000 cubic yards of rock was imported. In addition to the rock placement, an existing wood diversion structure and culvert were removed. Now that the project is complete, it is estimated that 20 miles of fish passage has now been restored to the Lostine River.

Filed Under: Current Projects

Cavender Wetland Enhancement for the Monument Soil and Water Conservation District

October 24, 2016 By genunlimited

SLC was selected by the Monument Soil & Water Conservation District to construct their Cavender Wetland Enhancement Project. Construction began in August of 2016 and completed it in October 2016.

The main goal of the project is to improve wetland and riparian habitat at a site adjacent to the North Fork of the John Day River, right outside of the City of Monument. The site was formally a saw mill pond that last operated in 1959. Multiple flooding events have deposited an estimated 6 feet of silt within the pond and created a wetland area which is very uncommon to the area.

Construction included installation of a large wood habitat structure that also functions as a bank protection structure, excavation of side channels within the existing wetland area, a few small wood habitat structures within the new wetland channels, lowering of the existing levee, removal of silt build up, and installation of 700 feet of Juniper rootwad fence along the lowered levee to keep livestock out of the river.

Filed Under: Past Projects

Find What You Need?

  • Home
  • Past Projects
  • Current Projects
  • About Us
  • Contact Us

Our Recent Projects

Wallowa Baker Restoration Fish Passage Project

Grande Ronde Model Watershed – Wallowa Baker Restoration Fish Passage Project

City of Pilot Rock – Stair Case Improvements

Beaver Creek Dam Fish Passage

City of La Grande – Beaver Creek Dam Fish Passage

sheep ridge construction project

Lostine River – Sheep Ridge Project

Contact Steve Lindley

PO Box 862
Union OR 97883
541-377-3476

Copyright © 2025 · Flex Pro Theme On Genesis Framework · WordPress · Log in