Grande Ronde Model Watershed – Wallowa Baker Restoration Fish Passage Project

November 29, 2017 By Steve Lindley

Fish Passage ProjectSLC was awarded the Wallowa River – Baker Restoration Fish Habitat and Riparian Enhancement Project by the Oregon Department of Fish and Wildlife and the Grande Ronde Model Watershed in November 2016. Construction began in February of 2017 and completed in July 2017.

The goal of the project was to create new river channel and floodplain area adjacent to the existing Wallowa River. Approximately 12,800 cubic yards of material was excavated during the project. Large wood structures for bank protection and future fish habitat were also installed.

Filed Under: Current Projects

Previous Post
City of Pilot Rock – Stair Case Improvements

Find What You Need?

  • Home
  • Past Projects
  • Current Projects
  • About Us
  • Contact Us

Our Recent Projects

Wallowa Baker Restoration Fish Passage Project

Grande Ronde Model Watershed – Wallowa Baker Restoration Fish Passage Project

City of Pilot Rock – Stair Case Improvements

Beaver Creek Dam Fish Passage

City of La Grande – Beaver Creek Dam Fish Passage

sheep ridge construction project

Lostine River – Sheep Ridge Project

Contact Steve Lindley

PO Box 862
Union OR 97883
541-377-3476

Copyright © 2025 · Flex Pro Theme On Genesis Framework · WordPress · Log in